FY 2027–2031 Transportation Improvement Program
The board adopted its five-year transportation budget: $254 million ($427 million with the current year), funding CR 512 four-laning, CR 510, Aviation Boulevard, resurfacing, sidewalks in Gifford and the Sebastian Inlet Bridge. This is the document that unlocks federal and state funding for local projects.
ELORA project access and Barber Bridge traffic safety
The board approved a court-ordered access easement for the ELORA apartment project, which requires a U-turn about 1,340 feet from the Barber Bridge — an intersection with two prior fatalities. Commissioner Moss warned the new turns will worsen already backing-up left-turn lanes; the rest of the board deferred to engineers and the 1993 court order.
Right-of-way and sidewalk rules in platted subdivisions
The Miller case shows homeowners that driveway work touching county right-of-way — even sidewalk sections that look like driveway — requires a permit and must meet concrete sidewalk standards. The board signaled similar cases could follow across that subdivision.
Public Works updates for Vero Lake Estates
The neighborhood's only real engineering plan is nearly 30 years old, and nobody knows the true condition of today's roads, culverts, and drainage. The committee voted to get cost estimates for a full assessment, which will be the foundation for picking future projects — and for deciding whether to ask residents for more MSTU money.
104th Avenue status
Good news: Public Works will cape-seal (chip-seal) 104th Avenue's north and south sections out of its own operating budget — roughly $350,000 — at no cost to the MSTU fund, though no date was given.
CR 510 widening and Wabasso crossing safety
School Board member David Dyer and Commissioner Moss raised the danger to students who aren't eligible for busing within two miles of school and must cross the hazardous 510/512 intersection on foot or bike. Staff noted a little-known hardship busing program exists.
13th Street Southwest traffic concerns near Emerson Oaks
Three residents told the board the planned realignment and paving of 13th Street Southwest will bring speeding and cut-through traffic into quiet neighborhoods. The board approved the Pulte agreement anyway, with Commissioner Earman noting he'd heard no prior complaints and inviting residents to call his office.
82nd Avenue project ranking and sewer connection
The MPO board years ago ranked the southern 82nd Avenue project above the northern one to avoid dumping traffic on an unimproved dirt segment. The project also may be how Sebastian connects to county sewer, and the northern segment may end up developer-built.
Roadway context classification
Staff previewed FDOT's context classification system (C1 rural to C6 urban core) that will roll out to local jurisdictions in 2029, with draft classifications already assigned to county road links.
Bicycle and Pedestrian Plan progress
The county has about 117 miles of bike lanes on the federal-aid network with 14 more under construction, and roughly 95 new miles programmed — nearly doubling the network — plus 60 new miles of sidewalks.
Bicycle and Pedestrian Master Plan progress
The upcoming two-year work program will include a long-overdue Greenways Plan update (last done 15+ years ago) and possibly a bicycle/pedestrian master plan update, with a focus on filling in north-south trail connections that current east-west networks lack.
82nd Avenue New Road right-of-way funding
FDOT is adding money and front-loading right-of-way funds so land purchases for the new 82nd Avenue road (26th Street to 69th Street) wrap up by about 2028. Actual construction is still likely a decade away.
SR 510 funding status
School Board member David Dyer and Commissioner Moss raised the danger to students who aren't eligible for busing within two miles of school and must cross the hazardous 510/512 intersection on foot or bike. Staff noted a little-known hardship busing program exists.
Vero Lakes Estates road conditions
The neighborhood's only real engineering plan is nearly 30 years old, and nobody knows the true condition of today's roads, culverts, and drainage. The committee voted to get cost estimates for a full assessment, which will be the foundation for picking future projects — and for deciding whether to ask residents for more MSTU money.
GO Line transit funding gap
GoLine posted a record ~1.6 million trips last year, up 17.2%, while remaining Florida's cheapest system per passenger at $3.42. Evening hours boosted ridership in both time slots, and the county secured an extra $712,000 in federal funds. Some members raised sustainability concerns about the ~$1.5 million annual county general fund contribution.
Wabasso community transportation concerns
Residents say Wabasso has been left out of transportation planning: dangerous sidewalks, only one route out of the community across US 1 and the railroad tracks, and no meaningful engagement. The board agreed to a future agenda item reviewing what's been done and planned for the area.
MPO Safety Targets and Vision Zero
The county is chasing a goal of zero traffic deaths and serious injuries. Most measures are improving, but bicyclist and pedestrian crashes stayed flat, and updated data pinpoints the county's 25 most dangerous intersections. Five of those have recently received new signals.
2026 List of Priority Projects
The committees recommended the annual list telling the state which projects to fund next — topped by the 45th Street Complete Street retrofit and the 510 corridor. The only new item is expanding the transit maintenance building from two to four bays.
Five-Year Transportation Funding Program
The TIP programs about $254 million of federal, state and local money over five years for road resurfacing, widening, trails, sidewalks and transit — roughly $427 million including the current year. Major projects include CR 512 widening, SR 510, and $29 million in A1A resurfacing.
CR 510/CR 512 state road transfers
CR 510 and part of CR 512 are transferring to the state highway system this year, opening up more funding sources. A member wants the entire CR 512 corridor to eventually become state road.
Aviation Boulevard/US 1 intersection project status
City of Vero Beach staff and property owners have been left guessing about the FDOT intersection project's status, with over $16 million in right-of-way funding now programmed. Staff will set up a TEAMS meeting with FDOT and the city.
North County Transit Hub
Design is underway on a new transit hub on State Road 510 north of Sebastian River High School, connecting four routes with hourly service. Construction should start in early 2027, paid for entirely by federal transit grants.
Right-of-way alterations (gravel driveways)
Two homeowners put gravel in the county right-of-way without permits. Public Works won't permit gravel there, so both must restore grass within 30 days — or the county may restore it and lien the property.
Transportation Technology and Data
Staff showed off online tools residents can use: FDOT traffic counts, the county's project dashboard, GIS flood zone maps, and — new this year — GoLine bus directions in Google and Apple Maps.
Unified Planning Work Program FY 2026/27–2027/28
The UPWP sets the MPO's planning agenda and roughly $1.6 million budget for July 2026 through June 2028, funded mainly by federal grants. It's smaller than the last cycle because the pricey 2050 long-range plan is done, and unused funds roll into a reserve for the next long-range plan.
Sidewalk gaps and traffic near Sebastian River High School
Parents lining up for dismissal back traffic up onto SR 510 so badly that emergency vehicles can't get through, and the signal runs on a timer at night. The committee wants the school district to rethink the pickup route and asked staff to send a letter and check whether the road widening construction might soon relieve the bottleneck.
North-south road capacity and regional growth pressure
A retired resident warned that St. Lucie and Brevard county developments — thousands of homes near Bucky's and the new St. John's Parkway interchange — will funnel traffic onto few connections like Coblegard Road and Babcock Street. He urged the county to push 58th Avenue's connection south and speed up 82nd Avenue widening before the region catches up with South Florida congestion.
2026 Title VI Program Update
The civil rights compliance plan the MPO must approve every three years to keep receiving federal transportation money. The update highlights that about 3% of county residents speak Spanish but not English well, mainly around Fellsmere, requiring bilingual outreach in those communities.
Fellsmere Pedestrian Safety on SR 512
Residents in Fellsmere walk along SR 512 to clinics, Dollar General, and Operation Hope with no sidewalks — some pushing strollers through high grass. Committee member Maura Stokes asked whether a temporary pathway could be built before the road widening arrives. Staff cited stormwater and flooding constraints but noted the widening will eventually bring sidewalks and paths.
A1A Improvements: Bike Lanes and Rumble Strips
FDOT's A1A project from Jasmine Drive to the county line may narrow travel lanes and trim bike lanes below the 7-foot buffered standard used elsewhere on the corridor. Cyclists and the committee warn that rumble strips next to bike lanes are dangerous — riders have nowhere to go when debris blocks the lane. The committee voted unanimously to send FDOT a letter demanding 7-foot lanes and no rumble strips.
Roadway project tracking sheet
At the Citizens Advisory Committee's request, staff created a one-page table showing where every major road project stands — study, design, right-of-way, construction — and which phases are funded. Members asked for a legend, an update date, and a public web link.
86th Lane Dedicated to Sergeant Sylvester McIntosh
The street where Vietnam hero Sylvester McIntosh lives will carry honorary signs naming it for him — a recognition that took some 50 years after his Silver Star-worthy actions.
GoLine Transit Plan Update
The bus system posted another strong quarter — 9,758 Community Coach trips and 390,000 GoLine trips, up 2%, with 95% on-time performance and the lowest cost per ride of any Florida transit system. Extended evening hours are adding riders without cannibalizing earlier trips.
New airport bus stops on Route 2
The GoLine now runs to the airport with three new stops installed over Presidents' Day weekend, and early ridership looks strong. Shelters are planned, with the airport funding one and the county the other.
Priority Ranking of Aviation Blvd. vs. 82nd Avenue Road Projects
The committee voted to recommend bumping the Aviation Blvd. widening and US 1/Aviation intersection projects above the two 82nd Avenue widening segments, citing airport growth and three commercial airlines. FDOT cautioned the swap may not actually speed anything up.
Local Traffic Safety Complaints: U-turns, Oslo Road Ramp, and Lighting
Members flagged three real trouble spots: unsafe U-turns at SR 60/43rd Avenue, a confusing temporary traffic pattern at the Oslo Road I-95 ramp under construction, and no street lighting at the dark 66th Avenue/SR 60 intersection. Staff agreed to take each to Public Works, the construction team, and FDOT respectively.
2026 Transit Development Plan Annual Update