Civic Issues
Topics getting the most attention in Temple Terrace public meetings, ranked by how frequently they are discussed.
6 issues in water utilities with high priority
Temporary water filtration solution and RFQ
Staff said quotes for an interim PFAS filter solution are stuck because vendors use proprietary materials that need their own bench testing. The city manager wants council direction to move forward on the permanent nano-filtration solution and hire a construction manager, with decisions planned for the September 15 meeting.
15% Utility Rate Increase
Water, irrigation, and wastewater bills rise 15% on October 1 — a typical $100 bill becomes $115. The increase covers Tampa's sewer rate hikes, water treatment plant upgrades, and PFAS remediation.
Rolling Terrace Retention Pond Drainage
FDOT is paying the full $869,138.20 to restore the 7.61-acre borrow pit and then hand it to the city, adding it to the stormwater system. Council members quizzed staff on how it affects flooding near the neighboring apartment complex.
Water Main Breaks and Utility Infrastructure in the River Hills Area
A failing water main on West River Drive broke twice, and staff plan to connect 31 homes to a cast-iron main across the road within two meetings. Council members pushed for maintenance and replacement planning in the upcoming budget.
Financing the Water Plant Improvements
A Stantec rate study shows two ways to fund the project: bond it all in 2027 (15% then 10% increases) or use a one-year line of credit and spread 10% increases over three years. The average $75 monthly bill could rise to $85-$95. Grants and state loans could reduce the burden.
West River Drive water line replacement
Fourteen homes will be switched off an aging water pipe that caused repeated disruptions earlier this year. The $14,140 fix uses savings from another project, so it's budget-neutral, and no boil water notice is expected.