10 issues in environment
Upham Beach south jetty and dune walkover projects
A member raised concerns that a sea oat planting event near Upham Beach went out under the committee chairman's name without committee involvement and occurred near the end of turtle season. Dunesavers volunteers responded that all proper clearances were obtained and no nests were active.
Wastewater Fee Increases
The one-time charge for new development connecting to the sewer system would rise about 45%, from $3,216 to $4,649 per equivalent residential unit, so growth pays its share of infrastructure. Rebuilding after storm damage wouldn't trigger the fee.
Blind Pass South Jetty Improvement
The commission endorsed the jetty improvement project, the required first step to pursue a Florida DEP grant covering up to half the cost.
Historic survey updates for Pass-a-Grille and Gulf Boulevard
The city has funding to survey the remaining Gulf Boulevard corridors and applied for a grant to update the 2015 Pass-a-Grille survey, which will document how hurricane recovery and redevelopment have changed contributing structures.
Green building standards in the Community Redevelopment District
Since 2008, development in the Special Planning Area has needed two green certifications, but one program (Florida Green Lodging) no longer exists, putting the Miramar Resort's opening in limbo. The board wants homes exempted and commercial rules modernized.
Mothball contamination on the beach
Mothballs dumped behind hotels prompted a zero-tolerance city statement. Commissioner Maldonado wants the city to assert victim status with the State Attorney, seek maximum penalties and restitution, and explore sanctions including liquor license consequences.
Pass-a-Grille Channel dredging and beach nourishment
A county/Army Corps dredging project will deepen the Pass-a-Grille Channel and place the sand on Pass-a-Grille beach, with temporary construction easements on city right-of-way. Work should finish by May 2027.
Resiliency Fund structure and funding
The stormwater rate increase was delayed to FY 2028 due to a March county filing timeline, leaving the fund running in the red another year. The committee also pushed for a clearer public explanation of the resiliency fund.
Shark fishing lights and wildlife harassment on the beach
A swimmer reported getting tangled in active fishing lines. Members want guidance or ordinance language requiring anglers to reel in near swimmers, and asked staff to raise the issue with the sheriff about enforcement options.
Don CeSar living seawall project
Free, pre-permitted living shoreline designs are nearly finished for three Maritana Drive homes and will be shared with waterfront residents — potentially 70+ properties. Some neighbors pushed back, worrying about bugs, oyster beds, and being forced into mangroves.