Civic Issues
Topics getting the most attention in Oviedo public meetings, ranked by how frequently they are discussed.
3 issues in roads with high priority
Doctors Court Extension to Oviedo Boulevard
The city wants to build a 1,500-foot connector road through wetlands between Doctors Court and Oviedo Boulevard, near Jackson Heights Middle School. It would cut emergency response times and give families a second way in and out of the neighborhood — but it costs about $2.8 million plus right-of-way from four parcels, and it eats into wetlands requiring $130,000 in mitigation.
Franklin Street Extension Progress
The CRA committed $49,125.53 toward replacing 22 failing crepe myrtles on E. Franklin Street with sable palms — the poor drainage and tight soil cells killed most of the old trees. The $136,940.94 project goes to Ovation Construction through a city-CRA MOU.
Mitchell Hammett corridor safety improvements
The city locked in a $1.5 million state grant for a raised median, wider sidewalk, and drainage work on what staff called one of the city's most dangerous stretches of road.