Gulf Boulevard undergrounding funding extension

The city was facing a roughly $4.2M local bill to finish Phase 2A even with $3.9M in county grant money, with several easements unresolved and no funding plan for Phase 2B. A majority concluded the beautification benefit wasn't worth the cost and flood risk, and staff will pursue raising Duke's flood-prone pedestals instead.

3 mentions (2 this month)Last discussed Nov 12, 2026
HighWater Utilities

$150 Million Utility Funding Gap

The city faces roughly a $150 million gap across sewer, stormwater and reclaimed water systems, built up over more than a decade. Wastewater is on a three-year rate plan expected to cover it, but stormwater and reclaimed water only cover current maintenance — not replacements or climate-driven needs.

1 mention (1 this month)Last discussed Nov 12, 2026
HighWater Utilities

Lift station rehabilitations and neighborhood opposition

Robinson flagged that the two-month delay of the Bella Vista lift station decision carries no contractor charges if approved by November 2, and that a conceptual study contemplates up to 21 smaller lift stations for stormwater in Bella Vista easements and rights-of-way.

4 mentions (1 this month)Last discussed Oct 27, 2026
HighWater Utilities

Stormwater Rate Delay and Resiliency Fund Clarity

The stormwater rate increase was delayed to FY 2028 due to a March county filing timeline, leaving the fund running in the red another year. The committee also pushed for a clearer public explanation of the resiliency fund.

4 mentionsLast discussed Sep 9, 2026
HighWater Utilities

Stormwater concurrency standard restoration

A 2024 code update accidentally erased the city's stricter 25-year, 24-hour storm standard, leaving big projects to handle only about 3.1 inches of rain instead of 10.5. The board wants it back, but only if single-family homes and duplexes are clearly exempt from on-site retention rules.

1 mentionLast discussed Aug 17, 2026
HighWater Utilities

Lift Station #4 storm resiliency improvements

The city wants Lift Station #4 — which serves all of Pass-A-Grille south of 22nd Avenue — to survive the next hurricane. Elevated controls and a backup generator mean faster sewage service recovery after storms like Helene and Milton, at lower long-term cost than storm repairs.

3 mentionsLast discussed Aug 5, 2026
HighWater Utilities

Boca Ciega Bay stormwater outfall improvements

A services agreement with BCS Construction Group, LLC, not to exceed $1,173,370, was scheduled for the stormwater outfall improvements project. Stormwater outfalls affect neighborhood drainage and flooding around Boca Ciega Bay.

1 mentionLast discussed Mar 24, 2026