NeutralRobert AustinbergOct 13, 2026

Greenpointe Developers' VP told the board the DRI never required the Glades Cut Off signal — the developer voluntarily installed the ~$600,000 span-wire signal for safety — and asked all three parties to split the $542,702 FEC tie-in cost. He also offered to install temporary warning signage.