Citywide Zoning Code Text Amendment (Ordinance 26-5611)
A package of changes to the city's zoning code covering everything from food trucks downtown to fences, spas, drainage and late-night business hours. Most residents won't notice day-to-day, but it shapes what businesses can open where and what new development must look like.
Historic designation without owner consent
The board is giving the draft Historic Preservation chapter of the Comprehensive Plan a third look. This chapter sets the long-term policy for how Sarasota protects its historic buildings and neighborhoods.
2026 General Election Results and Commission Transition
Sarasota is formalizing the November 3 election results for two at-large commission seats and seating the winners. This meeting sets who will be on the dais — and who leads it — for the next term.
Recreation and Open Space Chapter update
Sarasota is updating the parks and open space chapter of its comprehensive plan, which will shape how the city provides recreation facilities and protects open space through 2055. The open house gives residents a preview of the draft and a chance to weigh in early.
Citywide code enforcement docket of 36 cases
A pattern of owners and LLCs simply not appearing — the magistrate fines them in absentia and requires a representative at the next hearing. Some cases, like two Gillespie Avenue rentals and an RCP Lending property, have gone 9-14 hearings.
Unpermitted construction and permitting backlogs
Multiple owners described signed-and-sealed plans sitting unprocessed on desks, portal upload errors, and departments giving contradictory answers — turning simple after-the-fact permits into months of hearings.
Downtown mixed-use development at 200 S. Orange Avenue
A developer wants to replace three downtown buildings with 197 homes (79 of them attainable rentals for 30 years) plus restaurants and retail, using state Live Local Act density tools. Neighbors get to weigh in at this workshop before any formal application is filed.
Hart's Landing restroom and concession building
The storm-destroyed Hart's Landing bait shop, restrooms, and dock near John Ringling Causeway are on the path to being rebuilt, with the building moved upland out of the flood zone. Permitting could be streamlined since the site sits in FDOT right-of-way.
SARAC and the MLK Way cultural corridor
The commission locked in three agreements letting the Sarasota African American Cultural Coalition lease the Leonard Reid House site, attach a $458,000 state grant, and take more time on due diligence before buying three MLK Way parcels for $201,000 to build its cultural center.
Bayside Phase 1 Developer Public Art
A downtown tower will feature nearly $360,000 of integrated public art — a mosaic facade, orchid-themed ceramic vignettes, and a lit 'big top' installation facing the historic Rosemary cemetery. Residents get a more interesting streetscape along Cocoanut Avenue and May Lane, with art designed to be seen at walking speed.
Ongoing Public Art Projects Citywide
One of the city's most visible downtown buildings drew 153 applications for a single $100,000 commission. The committee punted selection to a December 16 special meeting after agreeing the volume of material warranted more review time.
Downtown Parking Services and Business Outreach
Lt. Shellhammer will present on downtown parking services along with a business outreach and survey initiative. Parking availability and cost are perennial concerns for downtown shoppers, workers, and business owners.
Transportation Chapter rewrite of the Sarasota City Plan (26-PA-02)
Mayor Trice pressed staff on whether the rewrite includes concrete pedestrian-safety tools, citing rising pedestrian deaths from high-profile SUVs. Staff pointed to Action Strategy 1.8, which requires crash-history evaluation for developments on over-capacity corridors, and a dedicated safety objective.
Affordable Housing Production Funding
The city's housing advisory committee says the single most important missing tool is a funded affordable housing trust fund, and recommends raising the affordable share of density-bonus units from 11% to 15%. The county already put local tax money into its fund; the city hasn't yet.
Expedited handling of state-mandated zoning changes
Three new Florida laws (HB 399, HB 683, HB 803) taking effect January 1, 2027 force Sarasota to change its zoning code — allowing mobile homes wherever single-family homes are allowed, exempting synthetic turf from impervious coverage, and adding window glazing limits. The Commission fast-tracked the process so changes land before the deadline.
Vacation rental registration enforcement
About 50 downtown vacation rentals would now have to register with the city, pass safety inspections, post a 24/7 responsible contact, and follow a 12-person occupancy cap. Supporters say it closes a two-year-old loophole; Realtors worry about a 70% fee increase and lack of operator input.
Senate Bill 180 Restrictions on Local Planning
A state law bars Florida cities from adopting rules more restrictive or burdensome than current ones until October 2027, forcing Sarasota to soften some sidewalk and transit language. Even after 2027, a permanent piece re-triggers the moratorium for a year after any hurricane strike within 100 miles.
City Manager's 100-Day Report and city finances
New City Manager Karie Friling laid out her first-100-days findings: a hiring freeze, storm-battered finances slowly recovering, a push for a commission-led strategic plan, park protection options, parking moving under police, and a proposed assistant city manager for community development.
Sidewalk safety and right-of-way encroachment
The new Rosemary District condo encroaches up to 1.14 feet — about 100 square feet — into Kumquat Court, missed by inspectors for over a year. Commissioners balked at a free encroachment agreement and continued the matter to negotiate public compensation such as street lighting, and demanded a fix to the inspection process.
Saravela two-tower development on North Tamiami Trail
A 282-unit mixed-use project with 40 attainable housing units is working through its fourth review round. Staff want another full review before partial sign-off continues, partly over short-term-rental confusion and utility design issues.
Avalon Litigation Settlement
The city faced a lawsuit in circuit court alongside Sarasota County over a purported deceptive investment solicited by a third party. Commissioners agreed to pay $60,000 to settle and obtain a full release, ending the litigation.
UBS Private Real Estate Liquidity Problem
Trustees pressed Graystone on the UBS private real estate fund's illiquidity — the fund has received only a fraction of expected distributions and may wait years for its money. The board discussed REITs as a liquid alternative but weighed the lost diversification benefit.
Pension Fund Investment Performance and Asset Allocation
The fund earned 9.9% for fiscal 2026 against a 6.5% target, and the board voted to formalize its allocation as "Allocation Two" with 5% emerging markets. This sets the benchmark the fund is measured against for years to come.
Ben Franklin Drive lights still dark until 2027
Streetlights along Benjamin Franklin Drive have been out since the 2024 hurricanes; repairs to 144 damaged poles won't go out to bid until early 2027, frustrating residents who want the work sped up.
Beneva Road rezone for 36 apartments
A request to rezone 2.8 acres at 1551 N. Beneva Road from RMF-1 to RMF-3 drew heavy neighborhood opposition over potential density, three-story building heights, traffic, and loss of trees and privacy for the adjacent Tallywood area.
Midtown Plaza redevelopment approved
The old Winn-Dixie shopping center near Sarasota Memorial gets a new life: a 145-room Courtyard Marriott, a 91-unit apartment building with 23 attainable units, retail, and a parking garage. The Planning Board had said no; the commission reversed it 3-2.
Longboat Key subaqueous sewer force main replacement
The city is spending about $1.46 million to line sewer laterals without digging up streets — extending pipe life 50-plus years at less than half the cost of open-cut replacement. Residents get door-hanger notices before work starts.
New Pass dredging and Lido Beach renourishment
Celine O'Connor thanked the city for the Lido dredge but urged reevaluation of the underfilled stretch between the southern rock groins and acquisition of Ted Sperling Park from the county.
Water ferry / water transit between the islands and Sarasota
The water transit dock project is paused until after the election, but Longboat Key officials made a passionate case for it — a season drive that takes 90 minutes could be an 18-minute boat ride. Cost, seagrass mitigation, and regional funding remain the obstacles.
School zone and red-light camera revenues
Police take the biggest bite of the General Fund — about 48%, at $53.3 million next year. Red-light and school-zone speed camera revenues are dropping sharply, which Chief Troche called a success: fewer violations means safer streets, even if the city collects less money.
Police 2025 performance and new technology
Violent crime dropped 18% last year and 56% over three years, with big seizures in Newtown. A philanthropist-funded drone program and real-time 911 software roll out later this year.
Parking fund shortfall and garage elevators
The parking division presented a rate and expenditure analysis; the commission directed staff to raise citation fees and extend paid hours, with funds planned for meters, elevators, signage and taking over the Bay Runner trolley.
Newtown sidewalk rehabilitation grant
Phase 1 sidewalk upgrades in Newtown are in design, with roughly $2 million in CRA and earmarked federal funds expected — not enough to cover all of Phase 1, so prioritization is underway. ADA-compliant curb cuts and intersection work are included.
ALICE report: half of Sarasota households struggling
United Way's new data shows 49% of city households earn below what it takes to get by — and it takes about $108,000 a year for a family of four here. Staff agreed to promote the 211 helpline in city communications.
School district noise exemption
Residents near Sarasota High say stadium PA, band practices, and HVAC pumps have disrupted their neighborhoods for four-plus years, with security called to games repeatedly. The speaker wants the city to strip schools of their noise ordinance exemption so they're no longer self-regulating.
Remnant Cafe homeless services operation
The city is paying $410,365 for 25 Salvation Army beds — free to clients — that served 361 people in 2025, with alternatives like jail costing far more per person.
Flood insurance discount and repetitive-loss mitigation
Adopted the five-year floodplain management plan, which helps the city maintain flood-insurance discounts and pursue mitigation grants.
Marian Anderson Place industrial rezone
Newtown Gateway's 9.22-acre brownfield rezone to industrial cleared first reading with new proffers banning commercial recycling and open-air rock crushing. Commissioners probed data center risk; the city says unlisted uses are already prohibited.
St. Armands paid parking and bond covenants
St. Armands parking revenue is ring-fenced by bond covenants to pay off garage debt, with enforcement costs coming from the citywide fund. Commissioner Alpert revisited the old understanding that downtown parking would follow St. Armands paid parking.
CIP project-by-project review
After lunch, the Commission walked the capital improvement list item by item — seawalls, bayou dredging, bridges, sidewalks, street resurfacing, undergrounding power lines, affordable housing, and city buildings. Vice Mayor Ohlrich pushed the page-by-page format, and Mayor Trice floated a public dashboard showing when each project starts and ends.
McCown Towers garage funding removed from CIP
The Housing Authority's 96-unit affordable housing project is $4 million short with a state deadline in early June — if it can't close the gap, Sarasota may have to hand back a $9 million state award. The city won't pay the gap but will write a letter urging the county to help.
Election Results
The primary election results are finally in, locking in the candidates who are moving forward in the Sarasota City Commission race. If you want to know who is still in the running to help lead our city, you'll want to check out the latest standings.
City garage back-in parking ban and $50 fee
New hours (8 a.m.–midnight streets, 24/7 garages) and $5-higher fines aim to make the parking fund self-sustaining. Downtown business owners warned it could deter evening and Sunday visitors.
1660 Ringling Boulevard redevelopment (Benderson)
Benderson wants to turn the vacant former county administration building into Class A office space with ground-floor retail. The Commission approved both the land-use change and rezone, keeping a ~92-foot buffer to protect the Laurel Park neighborhood.
Van Wezel operations, overtime, and the performing arts center pause
The commission moved $250,000 in Bay TIF money to the SPAC construction fund to pay consultants doing due diligence on the new concept design — including financial checks on running a 2,200-seat theater.
Hurricane Preparedness 2026
The city's emergency manager outlined a rebuilt EOC, a 120-hour storm timeline, trained damage-assessment teams, and a new disaster debris plan, plus a new emergency information phone line for when websites go down.
Solid Waste Surcharge for Storm-Debris Reserve
The city will raise solid waste rates about $3.63 a month to build a $5 million hurricane debris reserve over seven years, after spending $11.2 million on debris in five years and draining general fund reserves in 2024.
Pause on major projects pending November tax referendum
Big-ticket projects — the Performing Arts Center, Downtown Master Plan, water transit, and affordable workforce housing — are being paused until voters decide the November property tax reform referendum. Staff will spell out what keeps moving (like the SPAC contract and a housing land letter of intent) before the final budget vote.
Water and wastewater capacity and rates
The utility is running a 3.5% annual rate increase under an 11-year improvement plan adopted in 2019, and has about 30% wastewater treatment capacity left — good until roughly 2040. Staff plan to ask the state for more capacity after the treatment plant rehab.
Reserve Rebuilding and Revenue Stabilization
Hurricanes drained city reserves to 10.9% — well below the 17-25% policy target. Year two of a three-year plan projects reserves at 17.8% next year, plus a $3.8 million Revenue Stabilization Fund. Commissioner Ahearn-Koch suggested considering raising the policy target for a coastal city.