HighWater Utilities

Wastewater Treatment Plant Emergency Repair

A $129,000 emergency repair of wastewater plant concrete channels raised alarms about equipment being run to failure under the Jacobs operations contract. Commissioner Good wants Jacobs' maintenance reports shared so the city can plan ahead.

4 mentions (1 this month)Last discussed Nov 4, 2026
MediumWater Utilities

Sunswept Water System Replacement

The Sunswept neighborhood's aging community water system is slated for replacement, with Chen Moore and Associates named as the top-ranked design consultant.

4 mentions (1 this month)Last discussed Nov 4, 2026
HighWater Utilities

10-Year Water Supply Facilities Work Plan update

Staff told the board that the next meeting will include an unfamiliar item tied to the city's water supply plan, and encouraged members to get briefings beforehand.

3 mentions (1 this month)Last discussed Oct 21, 2026
HighWater Utilities

Pines Village water and sewer construction disruptions

Commissioners aired frustration with TECO, FPL, FDOT and telecom crews tearing up east-side streets with no notice or accountability, and called for a city text-alert system for resident notifications. The city attorney will research what permit conditions the city can still impose.

2 mentionsLast discussed Sep 16, 2026
HighWater Utilities

30-Inch Sewer Force Main Replacement

A $6.23 million contract with R.P. Utility and Excavation Corp will replace an aging 30-inch sewer force main — critical water-sewer infrastructure most residents never think about until it fails.

2 mentionsLast discussed Aug 19, 2026
HighWater Utilities

PFAS water treatment and low water rates

Mayor Castillo reported from a national water board meeting on the city's looming question: once PFAS is filtered out of drinking water using ion exchange, how do you safely dispose of it? The EPA is developing guidelines and staff will include disposal requirements in an upcoming RFP.

6 mentionsLast discussed Jun 3, 2026
MediumWater Utilities

Lift Station #64 rehabilitation contract

The city is spending up to $782,314.88 to rehab a sewer lift station, awarded to Intercounty Engineering. It keeps wastewater service reliable for residents.

2 mentionsLast discussed Apr 15, 2026
MediumWater Utilities

Master Lift Station No. 4 pump replacement

The city is spending up to $1.1 million to replace pumps, motors and control panels at Master Lift Station No. 4 — core sewer infrastructure most residents never see but depend on daily.

1 mentionLast discussed Apr 15, 2026
MediumWater Utilities

Wastewater system maintenance contracts

Three utility contracts covering well rehabilitation, injection well testing, and lift station repair parts — the invisible work that keeps sewers functioning.

1 mentionLast discussed Jan 7, 2026