Civic Issues
Topics getting the most attention in Oakland Park public meetings, ranked by how frequently they are discussed.
5 issues in water utilities
Emergency Stormwater Check Valve Repair
A $29,744.32 emergency procurement with DBF Construction was on the agenda to install a 24-inch inline check valve at NE 17th Terrace, likely to prevent flooding or backflow.
Stormwater flooding and the Lake Emerald impasse
The Lake Emerald Homeowners Association won't let the city use its property to connect western lakes to the C-13 canal, and the whole roughly $3 million grant could be lost. The City Manager is appealing to residents with contacts at the condo to help change their minds.
Water and Sewer Rate Increases
Water rates would rise 4% and sewer rates 7.5%, continuing the master plan adopted last year — meant to fund infrastructure without borrowing.
Galvanized water line replacements
The city is spending about $497,000 to swap out roughly 6,000 corroding galvanized service lines — the short pipes from the main to your meter — improving water quality and reliability.
Stormwater flooding and master plan projects
The city is spending millions on drainage — a $5 million pump station at NE Sixth Avenue, Cherry Creek dredging, and Floranada Business District well improvements — but the City Manager admits flooding can't be fully solved in a low-lying city facing heavier rains and sea level rise. Residents still see flooding on Sixth Avenue and Prospect.