Civic Issues
Topics getting the most attention in New Smyrna Beach public meetings, ranked by how frequently they are discussed.
16 issues in roads
Neighborhood cut-through traffic
A resident described cars doing 50-60 mph cutting through Oak Lane and Selleck Avenue to reach SR 44 because there's no easy eastbound exit from the Zaxby's plaza. He asked for speed bumps or turn restrictions; McGuirk wants the Sugar Mill left-turn restriction reopened as the easy fix.
Washington Street Roadway Improvement Project
Long-delayed roadway project finally went out to bid October 16, with bid opening January 13 — commissioners called it years overdue.
Shops of NSB shopping center traffic and neighborhood impacts
An 11.3-acre wooded parcel at South Myrtle and SR 44 would become a Sprouts and TJ Maxx shopping center, bringing a $31 million investment and roughly 270 jobs — but also heavy traffic on a two-lane road used by school traffic. Neighbors flooded the mic in opposition; the board still recommended it 4-1, with detailed traffic and site-plan review to come.
Bay Drive and Dillon Circle private road maintenance
Residents who live along the private roads say they pay thousands a year out of pocket to maintain them, the roads are badly deteriorated, and emergency vehicles may not be able to get through. Any future public access to the preserved land would make it worse. Staff said bringing the roads into city maintenance requires annexation, deeding the right-of-way, and millions in upgrades.
Selleck Avenue cut-through traffic and speeding
A resident pressed for speed bumps and enforcement on Oak Lane and Selleck Avenue, and McGuirk pushed to remove the left-turn restriction onto Sugar Mill Drive. The county owns the sign; the city engineer is engaging with the county.
Saxon Drive Traffic Calming
Years of resident complaints about speeding on Saxon Drive led to a raised pedestrian crosswalk at Eighth Avenue, unanimously approved. Residents want more — a crossing near Coronado Elementary, a 30 mph limit, and an emergency signal at Fire Station 52 — and officials say additional sections need separate applications under the traffic calming handbook.
I-95 Overnight Closures and SR 44 Construction
FDOT will close I-95 overnight for six nights starting September 23 to build the new Pioneer interchange, detouring heavy trucks down SR 44 and Airport Road through Venetian Bay. Extra police patrols and state officers at signals will manage traffic.
$449K smart parking sensor system
The parking guidance system RFP closes April 15, kiosks will be phased out for mobile payment, and enforcement is transitioning to the Parking and Mobility department. A temporary lot near the hospital and a future Smith Street park-and-ride hub are planned.
Old Mission Road resilience corridor proposal
Staff detailed the completed North Atlantic drainage project ($1.5 million, grant-funded), the Corbin Park stormwater project ($6 million county grant, groundbreaking April 8), Turnbull canal dredging, and Stormwater Master Plan Phase 2 covering a 129-square-mile basin. Officials said no conclusive evidence ties recent development to increased flooding.
Mission and Taylor Road safety
A resident returned a year later to say nothing has changed on Mission Road between Josephine and Taylor — another car in the ditch last week, trucks on no-truck roads, and new development adding traffic.
Beachway Avenue public right-of-way
A fight over whether two homeowners can pave the public shell road right-of-way for their driveways. Approved with signage, but residents worry it looks and feels privatized.
Museum building struck by delivery trucks
Delivery trucks exiting the alley by the Museum of History keep hitting the historic building — three times in 18 months. The museum director wants a traffic study and turn restrictions.
Road resurfacing funding boost
The long-awaited repaving of SR-44 starts around July 20 — expect milling, lane closures, new sidewalks and turn lanes, and significant travel disruption.
Unified city-county parking permit
Residents have needed separate permits for city and county lots, causing confusion and hundreds of unfair tickets. Starting January 1, 2027, one Park Volusia permit will work everywhere, with auto-renewals and no more ticket traps.
State Road 44 resurfacing
The long-awaited state resurfacing of State Road 44 begins July 20. Expect disruption: milling, repaving, new sidewalks and turn lanes will affect eastbound travel for weeks.
Myrtle Avenue school-zone traffic and the East Coast Railroad property
A resident urged the city to move the planned mall entrance off South Myrtle Avenue — where three schools already create gridlock — to Dixie Freeway and Sixth Street.