Florida Record
Marion County
MS

Michelle Stone

Commissioner District 52024-11-01 to 2028-11-01 (month-level start: November 2024 per Marion County Legistar office records re-seating; month-level end: November 2028 per Fla. Stat. 100.041(2)(a) second Tuesday following the general election, statute text read at leg.state.fl.us)

No biography on file yet.

At a glance

News mentions
0

Term ending Nov 1, 2028.

Voice

Meetings spoken in
49
Total speaking time
3:50:54
Avg per meeting
4:43
Segments
3549

Want every word Stone has said?

The OpenCity MCP for Claude.ai answers questions like “what has Stone said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (20)(Roads)

medium↑Sep 2026[15]

NE 35th Street right-turn lane and road widening

Up to $160,000 for NE 35th Street parcels and $863,150 for the 80th/70th Avenue acquisition.

high↑Oct 2026[15]

Highway 40 drainage retention area and right-of-way exchange

The developer estimates roughly $500,000 in value to the county at zero cost; the county has sunk over $3 million in the project.

medium↑Sep 2026[15]

SE 136th Court closure and Lake Weir canal

Could reduce county canal-maintenance costs; potential future cost if the canal is filled in.

medium↑Oct 2026[13]

East Highway 318 speed limits

Minimal; variable message boards and possible extra sheriff patrols.

high↑Jul 2026[12]

SW 27th Avenue (CR 475A) at SW 66th Street intersection study

About $4 million in drainage and road-raising work either way, plus roughly $1.6 million for a signal or $2.3 million for a roundabout — right-of-way costs not yet included.

high↓Jul 2026[11]

NW 49th Street Phase 3 right-of-way and SW 80th Avenue road projects

$1,295,376.80 for this acquisition alone, part of a multi-million-dollar corridor program.

medium↓Aug 2026[10]

Atlas Tranquility Park Dead-End Road Waivers

high↓Sep 2026[8]

Silver Creek Road and Drainage Improvement Area Assessment

$444,063.65 total, split as $11,685.89 per parcel prepaid or about $1,283.69 a year over 15 years.

high↓May 2026[7]

Road project acceleration through bond sales

Up to $190 million in bonds, repaid with infrastructure sales tax revenue.

low↓Sep 2026[5]

NE 7th Street Sidewalk Gap

Not yet estimated; subject to the county sidewalk plan.

low↓Aug 2026[5]

Temporary construction access on Baseline Road

Restoration and permitting costs fall on the applicant, not the county.

high↓Jul 2026[2]

Commercial access onto substandard residential road near Dunnellon

high↓Jun 2026[2]

SW 66th Street bridge closure over I-75

medium↓Jun 2026[2]

Belleview Heights Estates Unit 8 road paving

Up to $20,385.63 per parcel over 15 years, roughly $180 per month per property owner.

high↓Jun 2026[2]

Marion Oaks commercial access and CR 484 traffic management

A corridor access plan could require county staff time or a paid consultant, similar to other master planning efforts.

medium↓Jul 2026[2]

US 441 corridor pedestrian and cross-access standards

The dealership will owe a county-determined sidewalk fee instead of building the sidewalk itself.

high↓May 2026[2]

Walls along arterial and collector roads for new residential development

A developer testified an 8-foot engineered wall runs about $200 per linear foot — roughly $6.5 million on one large project.

high↓Jul 2026[2]

Silver Springs Shores East road paving

Not yet priced — staff will bring recommendations back, likely involving bonds and assessments paid by property owners in the area.

medium↓Jun 2026[2]

Self-storage truck access on narrow SW 196th Avenue

critical↓Jul 2026[2]

Future of Marion Transit amid Marion Senior Services divestiture

The county's roughly $1.5 million transit match and the service relied on by ~89,000 annual riders hang on how the transition is structured.

Decisions during term (4)

Recorded while Stone was in office — not necessarily decisions they moved, spoke to, or voted on.

Voting record (0)(Roads)

No votes found matching Roads.