Top issues during term (20)(Roads)
NE 35th Street right-turn lane and road widening
Up to $160,000 for NE 35th Street parcels and $863,150 for the 80th/70th Avenue acquisition.
Highway 40 drainage retention area and right-of-way exchange
The developer estimates roughly $500,000 in value to the county at zero cost; the county has sunk over $3 million in the project.
SE 136th Court closure and Lake Weir canal
Could reduce county canal-maintenance costs; potential future cost if the canal is filled in.
East Highway 318 speed limits
Minimal; variable message boards and possible extra sheriff patrols.
SW 27th Avenue (CR 475A) at SW 66th Street intersection study
About $4 million in drainage and road-raising work either way, plus roughly $1.6 million for a signal or $2.3 million for a roundabout — right-of-way costs not yet included.
NW 49th Street Phase 3 right-of-way and SW 80th Avenue road projects
$1,295,376.80 for this acquisition alone, part of a multi-million-dollar corridor program.
Atlas Tranquility Park Dead-End Road Waivers
Silver Creek Road and Drainage Improvement Area Assessment
$444,063.65 total, split as $11,685.89 per parcel prepaid or about $1,283.69 a year over 15 years.
Road project acceleration through bond sales
Up to $190 million in bonds, repaid with infrastructure sales tax revenue.
NE 7th Street Sidewalk Gap
Not yet estimated; subject to the county sidewalk plan.
Temporary construction access on Baseline Road
Restoration and permitting costs fall on the applicant, not the county.
Commercial access onto substandard residential road near Dunnellon
SW 66th Street bridge closure over I-75
Belleview Heights Estates Unit 8 road paving
Up to $20,385.63 per parcel over 15 years, roughly $180 per month per property owner.
Marion Oaks commercial access and CR 484 traffic management
A corridor access plan could require county staff time or a paid consultant, similar to other master planning efforts.
US 441 corridor pedestrian and cross-access standards
The dealership will owe a county-determined sidewalk fee instead of building the sidewalk itself.
Walls along arterial and collector roads for new residential development
A developer testified an 8-foot engineered wall runs about $200 per linear foot — roughly $6.5 million on one large project.
Silver Springs Shores East road paving
Not yet priced — staff will bring recommendations back, likely involving bonds and assessments paid by property owners in the area.
Self-storage truck access on narrow SW 196th Avenue
Future of Marion Transit amid Marion Senior Services divestiture
The county's roughly $1.5 million transit match and the service relied on by ~89,000 annual riders hang on how the transition is structured.
Decisions during term (4)
Recorded while Curry was in office — not necessarily decisions they moved, spoke to, or voted on.
Request Approval of Change Order to Purchase Order 2500654: 23Q-087-TO-26 Civil Site Engineers for Miscellaneous Projects - Engineering Design Services for Chatmire Subdivision Roads - Guerra Development Corp., Ocala, FL 34470 (Budget…
Request Approval of a U.S. Department of Transportation Grant Agreement Under the Fiscal Year 2024 Safe Streets and Roads for All Grant Program and Supporting Resolution for the Maricamp Road Multimodal Safety and Access Management…
Section 4.3.12 — Roadside Vendors (2.2)
Request Approval of a Utility Easement Between Marion County and The Florida Governmental Utility Authority in Association with the Transfer of Chatmire Roads (Budget Impact - None)