NE 35th Street right-turn lane and road widening

The board authorized buying two parcels (up to $160,000) for the NE 35th Street widening project, plus a separate $863,150 acquisition for the SW/NW 80th/70th Avenue project — both steps toward relieving congestion on growing corridors.

2 mentions (1 this month)Last discussed Nov 3, 2026
HighRoads

SW 27th Avenue (CR 475A) at SW 66th Street intersection study

This congested, flood-prone intersection is projected to hit failing levels of service by 2048. A multi-lane roundabout outperforms a modified signal on delay, safety, and benefit-cost, and staff is moving toward a public meeting before final adoption.

2 mentions (1 this month)Last discussed Nov 3, 2026
HighRoads

Highway 40 drainage retention area and right-of-way exchange

Developer Todd Rudnynian pitched trading land with the county to relocate a drainage pond, claiming half a million dollars in value at no cost — but commissioners balked at pausing a nearly finished road project and asked staff to bring back full details.

2 mentions (1 this month)Last discussed Oct 21, 2026
MediumRoads

East Highway 318 speed limits

The board raised speed limits on Highway 318 based on a traffic study, over one resident's objections about heavy truck traffic, a dangerous S-curve, and deer at night. Commissioners committed to message boards and asked the sheriff for extra patrols during the change.

2 mentions (2 this month)Last discussed Oct 20, 2026
MediumRoads

SE 136th Court closure and Lake Weir canal

The committee voted to recommend denial of a petition to close SE 136th Court, saying vacating unique roadways without support isn't in the public's interest. The Board of County Commissioners makes the final call.

2 mentions (1 this month)Last discussed Oct 20, 2026
MediumRoads

Atlas Tranquility Park Dead-End Road Waivers

Three developments asked to skip cul-de-sacs on short dead-end roads. The committee denied two and forwarded them to county commissioners, and the third was withdrawn — a signal the county is holding firm on emergency access and road-turnaround standards.

2 mentionsLast discussed Sep 21, 2026
HighRoads

Silver Creek Road and Drainage Improvement Area Assessment

Residents of Silver Creek and Silver Creek 1st Addition will pay a special assessment — about $11,686 per parcel or ~$108/month for 15 years — to resurface 0.92 miles of deteriorated roads. Most ballot responses favored it, but some fixed-income residents say it's a hardship. The county has assistance programs for those who qualify.

4 mentionsLast discussed Sep 21, 2026
HighRoads

Road project acceleration through bond sales

The county is setting up bond financing backed by the infrastructure sales tax to build shovel-ready road projects years early — including the 40th Street widening near the high school and the Marion Oaks Manor flyover extension. Expect construction activity and congestion relief across the county in the next couple of years.

2 mentionsLast discussed Sep 15, 2026
LowRoads

NE 7th Street Sidewalk Gap

A resident asked the county to add roughly a mile of sidewalk on NE 7th Street east of Baseline Road, where pedestrians have nearly been struck. Staff will have the county engineer follow up.

1 mentionLast discussed Sep 1, 2026
HighRoads

NW 49th Street Phase 3 right-of-way and SW 80th Avenue road projects

The county is spending over $1.3 million to acquire land for the 80th/70th Avenue widening, and one resident blasted the recurring cost of buying back right-of-way after development.

4 mentionsLast discussed Sep 1, 2026
LowRoads

Temporary construction access on Baseline Road

A construction project gets a temporary driveway off Baseline Road (Hwy 35) for up to 12 months, with safeguards for the berm and traffic control.

1 mentionLast discussed Aug 31, 2026
HighRoads

Commercial access onto substandard residential road near Dunnellon

Residents worry commercial traffic from a new mini-storage site will be dumped onto 19-foot-wide Southwest 196th Avenue, where pedestrians and kids walk in the travel lane. The county engineer testified under oath that access will go to U.S. 41 with cross-access instead, and the applicant agreed.

1 mentionLast discussed Jul 22, 2026
MediumRoads

US 441 corridor pedestrian and cross-access standards

The committee drew a line on the 441 Modular Home Dealership: the dealership must pay a sidewalk fee instead of building sidewalk, but it cannot skip cross-access connections to future neighboring developments. With a state shared-use path funded for 2027 on the west side, the county is holding developers to long-range connectivity along the highway corridor.

1 mentionLast discussed Jul 20, 2026
CriticalRoads

Future of Marion Transit amid Marion Senior Services divestiture

Marion Senior Services wants out of running Marion Transit by year's end because of insurance costs and lawsuit risk. Nearly 90,000 rides a year are at stake, and commissioners agreed a TPO-level workshop is the best venue to find a fix — possibly even lobbying the legislature for sovereign immunity for transit providers.

2 mentionsLast discussed Jul 16, 2026
HighRoads

Silver Springs Shores East road paving

The county engineer identified 81.5 miles of crumbling 30-to-35-year-old roads in Silver Springs Shores East that fall outside the existing MSTU. Staff proposed bonding the paving cost, then using smaller assessments to fund ongoing maintenance — lessons learned from the successful Marion Oaks and Silver Springs Shores assessment cycles.

1 mentionLast discussed Jul 14, 2026
MediumRoads

Self-storage truck access on narrow SW 196th Avenue

A self-storage facility rezoning off US 41 drew opposition over a site plan that routed trucks onto SW 196th Avenue, a 19-foot-wide road used by pedestrians, cyclists, and pets. The developer now says he'll seek US 41 access with FDOT's blessing, calming most opponents.

1 mentionLast discussed Jun 29, 2026
HighRoads

Marion Oaks commercial access and CR 484 traffic management

Deltona wants a convenience store access cutting across Marion Oaks greenbelt land near the SR 200/CR 484 and Marion Oaks Course intersection. Commissioners worry more curb cuts will worsen an already troubled corridor, and flagged the county's earlier closure of median cuts, the need for a holistic commercial access plan, and future trail connectivity.

2 mentionsLast discussed Jun 17, 2026
HighRoads

SW 66th Street bridge closure over I-75

FDOT shut the SW 66th Street bridge over I-75 for twelve months of repairs, stacking detours on an already-congested corridor. Commissioner Bryant flagged backed-up turn lanes and asked for signal and stacking-lane fixes with the city and DOT.

1 mentionLast discussed Jun 16, 2026
MediumRoads

Belleview Heights Estates Unit 8 road paving

After a 20-year resident's petition won 80% support, 15 property owners will pay up to $20,385.63 each over 15 years (about $180/month) to pave SE 44th Avenue. Construction starts within 30-60 days.

3 mentionsLast discussed Jun 16, 2026
HighRoads

Walls along arterial and collector roads for new residential development

The board wrestled with requiring 8-foot engineered walls (or berm-and-wall combos) where new homes back onto arterial or collector roads, instead of today's fence-and-landscape buffer. Supporters point to safety and looks; critics, including a developer, say walls could add millions in costs and look like prisons — and there are unresolved right-of-way complications if roads get widened later.

1 mentionLast discussed May 18, 2026