Southend utility redevelopment project cost increase

Beaches Energy swept all four FMPA awards with outage times under 20 minutes a year, but its three 1982 transformers are nearing end of life. The council bought a replacement three years early to beat rising prices and data-center-driven lead times, with a federal grant potentially covering 75% of a second unit.

2 mentions (1 this month)Last discussed Oct 26, 2026
HighWater Utilities

Emergency Sewer Repair at Lift Station 18

A collapsed clay pipe turned into a sinkhole at Lift Station 18 near 22nd Street North, and the council signed off on a $263,372 emergency fix — the cheapest of five quotes — that also upgrades an undersized manhole and reduces the cost of a future station overhaul.

1 mentionLast discussed Sep 21, 2026
HighWater Utilities

Federal Grant for Undergrounding Power Lines (2nd–12th Ave N)

The $1.6 million federal grant pays about 65% of a $2.45 million project to bury overhead power lines west of Penman Road between 2nd and 12th Avenues North — an area with big tree canopy that loses power in storms. Burying lines means fewer storm outages, and the federal share keeps the cost off ratepayers.

1 mentionLast discussed Jul 20, 2026
HighWater Utilities

New Water Well #16 and Raw Water Main Extension

The city is building a new potable water well on Sixth Avenue North after earlier bids for a different site came back unbuildable. It boosts the city's drinking water capacity, but nearby flooding issues and a future stormwater project remain open questions, and there will be short-term traffic closures on one block.

1 mentionLast discussed Jun 1, 2026
HighWater Utilities

Phase 3 Extreme Water Shortage

Northeast Florida is in a severe, year-long drought with aquifer levels at record lows. The water management district has imposed Phase 3 restrictions — one day a week of lawn watering, no daytime irrigation — and asked the city to help with common-sense enforcement.

2 mentionsLast discussed May 18, 2026
HighWater Utilities

Central and South Basin culverts and pump stations

Big pumps and new culverts are coming to the central and south drainage basins, which means Fairway and 9th Avenue South will be temporarily closed while crews work. King-tide overtopping protection is also being added to the central basin weir.

1 mentionLast discussed Mar 12, 2026
HighWater Utilities

Downtown stormwater project Phase 3C completion

The biggest drainage project the city has tackled in years is wrapping up under budget, with the contractor earning an early-finish bonus. Expect roughly $750,000 to $1 million to come back unspent.

1 mentionLast discussed Mar 12, 2026
HighWater Utilities

Golf Club Pond Connection and Irrigation Improvements (SB 64 compliance)

The city is spending $7.46 million to upgrade golf course irrigation from covering 30-35% of the course to 100%, a linchpin step toward the state-mandated 2031 deadline to eliminate surface water discharge. The golf course doubles as stormwater infrastructure, so this project serves both recreation and utility goals.

1 mentionLast discussed Feb 2, 2026