Florida Record
Hollywood

Civic Issues

Topics getting the most attention in Hollywood public meetings, ranked by how frequently they are discussed.

Filtered to Critical
Filtered to 6m

11 issues with critical priority

CriticalTaxes Budget

Amendment 3 Property Tax Reform Impact

Commissioners spent a lot of time on the state's property tax overhaul — about $28 million a year hit to Hollywood by year two. Ideas floated: commissioners rolling back their own raises, set budgets for downtown events, and tightening spending everywhere.

5 mentions (1 this month)Last discussed Nov 5, 2026
CriticalZoning

Hollywood Beach Overlay District

The city is proposing new zoning rules and design guidelines for the beach area stretching from the Intracoastal Waterway to the ocean. This could shape building heights, rooftop amenities, and the look of future development on the beach. The hearing itself never happened because of a posting error — it resumes September 8.

35 mentions (1 this month)Last discussed Nov 5, 2026
CriticalWater Utilities

Central Beach tidal flooding and backflow preventers

The September king tide plus Nor'easter pushed a record 2.77-foot tide over parts of the Broadwalk, flooding streets and businesses near Michigan Street. Board members asked staff to develop a pilot using knee-wall closures or removable gates at the lowest-elevation stretch, and debated dunes versus hardscape. An expert confirmed today's king tide levels become the normal sea level by 2050.

7 mentions (1 this month)Last discussed Oct 21, 2026
CriticalDevelopment

The Club at Emerald Hills Redevelopment

166 acres of the golf course will shift from Country Club to Planned Development zoning, setting up a master-planned redevelopment eight years in the making. First reading passed unanimously with no public opposition; a second reading still ahead.

20 mentionsLast discussed Oct 7, 2026
CriticalZoning

Hollywood Beach comprehensive plan amendments (File 26-L-18)

Three first-reading ordinances create a hotel density bonus, transfer of development rights, and flexibility-unit framework for the barrier island — the skeleton for a future beach overlay zoning package. Residents warned the framework is rushed and could permanently change the low-profile character of the beach.

9 mentionsLast discussed Oct 7, 2026
CriticalGeneral

1301 South Ocean Drive and Hollywood Beach Hotel redevelopment concerns

The Commission narrowly approved changes to the development agreement for the property at 1301 S. Ocean Drive after hours of public comment, with Commissioners Shuham and Quintana opposed.

11 mentionsLast discussed Oct 7, 2026
CriticalBudget

Flat operating millage proposal for FY 2027

The city set the operating millage at 7.4293 mills, about 6% above the rolled-back rate, meaning most property owners will pay somewhat more. Commissioners argued the rate is still lower than a decade ago and that looming Amendment 3 makes cutting revenue risky.

7 mentionsLast discussed Sep 23, 2026
CriticalWater Utilities

Five-year capital improvement program for core water and sewer infrastructure

The city adopted a 25-year, five-phase plan to connect septic-neighborhood homes to sewer, plus new water and sewer rates through 2031. Septic homeowners will eventually face connection costs, but the program protects groundwater and reduces flooding risk.

7 mentionsLast discussed Sep 23, 2026
CriticalWater Utilities

WATERWORKS 2050 master plans adopted

The city adopted its 25-year, $2.7 billion water and sewer roadmap, covering PFAS removal, consent-order plant repairs, and a $1.3 billion septic-to-sewer program. Residents should expect continued utility rate increases to fund it.

2 mentionsLast discussed Jul 7, 2026
CriticalEnvironment

Joining the Broward County Solid Waste Authority (facilities amendment)

The commission conditionally approved county interlocal amendments for solid waste disposal and recycling processing after extensive debate — Hernandez was the lone no vote.

2 mentionsLast discussed Jul 7, 2026
CriticalEnvironment

Septic-to-sewer conversion program

The city adopted a 25-year, five-phase plan to connect septic properties to sewer, along with water and sewer rate schedules through 2031. Gruber dissented on the sewer expansion and rates; residents like Ann Ralston raised cost concerns.

6 mentionsLast discussed Jul 7, 2026