Civic Issues
Topics getting the most attention in Eustis public meetings, ranked by how frequently they are discussed.
3 issues in water utilities
Water Service and Future Annexation, 110 Fruitwood Avenue
A homeowner just outside city limits will get Eustis water in exchange for agreeing to join the city down the road — and pay higher out-of-city rates until then.
Utility rate increase (2.5%)
Water, wastewater and reclaimed water rates go up 2.5% starting June 1 — visible on July bills. It continues the schedule set in the 2021 in-house rate study while a full consultant study is underway.
Utility infrastructure — lift station generators, water tank, and cast iron pipes
Big-ticket utility work: replacing a condemned $1.7 million ground storage tank, adding generators to lift stations one at a time before hurricanes, replacing aging sewer force mains, and phasing out cast iron water mains that cause rusty water complaints.