Top issues during term (20)(Roads)
E. Gospel Island Road Resurfacing
The resurfacing itself is $3,392,001, largely covered by state SCOP funds.
Road resurfacing backlog
Fog sealing is included in the existing pavement management program; no new cost stated.
SR 44/Kensington Avenue raised median
Unknown cost to modify or remove the median; business owners say lost access could kill small tenants.
Park road washout and community building repairs
Repair costs weren't discussed in detail.
W. Mustang Blvd resurfacing
Covered within the existing resurfacing treatment; no separate cost identified.
Road easement obstruction and safety near the sand mine
Transportation concurrency defeated
Could shift future road improvement costs between developers and taxpayers depending on timing.
CR 491 widening funding strategy
About $13 million to Hampshire — and commissioners plan to drain transportation impact fee reserves to nearly zero to get there.
Citrus Springs road resurfacing
Residents report vehicle damage and threatened property-tax disputes tied to unfinished road surfaces.
Roadway maintenance and mowing
Halls River multi-use path funding gap
$5.7 million gap on a project now estimated at roughly $12 million.
Crystal River Water Access and Boat Ramp Concerns
Not quantified in this meeting.
Lecanto VA Clinic right-of-way dedication
No direct county cost identified, but future widening of the Homosassa Trail/44 intersection or Southern Street could carry public infrastructure costs.
Turkey Oak Road capacity and turn lane requirements
Conditions would place turn lane and signal upgrade costs on the developer; the county faces separate resurfacing and widening costs.
Crystal Manor golf cart zone
The proposed study would have cost $50,000-$57,000, suggested from the Duke Special Projects Fund.
State Road 200 traffic and evacuation capacity
Any turn lanes or widening would fall on the developer and FDOT, not the county, but congestion costs residents time now.
Moonraker Terrace Private Road Conditions
Paving would require an MSBU assessment on the affected property owners.
Homosassa Trail (CR 44) Turn-Lane Congestion
West Southern Street improvement
County would bear any future cost of widening and paving Southern Street beyond the applicant's frontage.
Gobbler Drive / US 41 Traffic Safety
Decisions during term (0)
Recorded while Kinnard was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.
Voting record (0)(Roads)
No votes found matching Roads.